Fieldwork: Moscow, Armenia,
Georgia & North Ossetia
Pre-fieldwork materials. MSU, 2021
Landuse and Cognitive Zoning of Krasnoselsky District, Moscow
The presentation is posted partially.
Materials for fieldwork preparation.

Index
  1. Title
  2. Terrain
  3. Architectural differentiation
  4. Cognitive zoning
  5. Integral zoning
Landuse and Cognitive Zoning of Mozhaisky District, Moscow
The presentation is posted partially.
Materials for fieldwork preparation.

Index
  1. Title
  2. Landuse
  3. Socio-economic zones
  4. Cognitive zoning
  5. Integral zoning
Yerevan Trolleybus Demand
The presentation is posted partially.
Materials for fieldwork preparation.

As part of the fieldwork in Yerevan, passenger flow measurements were conducted on trolleybus route #2. The main goal was to determine the demand for this mode of transport, as there are very few routes left in the city. A visualization of the results is presented on the scheme.

The second diagram is a concise visualization of Yerevan trolleybus routes from the internship report.

All of these images are zoomable.
Other Transit Maps
Related to the Fieldwork
Materials for fieldwork preparation.

Index
  1. Yerevan Metro Network
  2. Yerevan Tram Network (in 1986, now closed)
  3. Tbilisi Metro Network
  4. Rustavi Trolleybus Network (in 1990, now closed)
  5. Kutaisi Trollybus Network (in 1987, now closed)
  6. Batumi Trollybus Network (in 1993, now closed)
  7. Vladikavkaz Tram Network
  8. Vladikavkaz Trolleybus Network (in 2010, now closed)
Made on
Tilda